PARKWAY HILLS BAPTIST CHURCH, PLANO, TEXAS
This project was built in 4 phases. (shown in wide picture in the left, below).  The original building  is the single story part on the right.

Then came Phase I. This was the first floor.  It included more classrooms and a new sanctuary.  Phase II added rooms to the second floor of the same building.  This new section (phases I & II) of the building has 15 roof top A/C units.  The Building Automation System (see first two control pictures below, on left). was first installed in Phase I and expanded in Phase II.



 

Phase III (shown to left) has a chill water system and electric heat for 36 air handling units.  Also motorized outside air dampers.  All is tied to the  Building Automation System, expanded again. 
This phase was completed in 2002.